The St. Simon Island Fishing Pier Rehabilitation consisted of rehabilitation of portions of the T-shaped concrete pier located on the south end of the island utilizing epoxy injection for cracks and carbon fiber fabric wrap for spalled areas. Repaired sections included 25 concrete piles, 7 pile bent caps, 20 PSC bridge deck slabs, 12 double T-beams, the deck surface, and 6 canopy columns. EMC Engineering Services, Inc.’s services included the preparation of a Conditions Survey and Corrective Measures Report, a structural analysis of the concrete members, construction plans and specifications, and construction phase services.